Section 05 ELECTRICAL SYSTEM Subsection 05 (STARTING SYSTEM) If test succeeded, problem is in the control circuit going to ECM. Perform the START/STOP SWITCH CONTROL CIRCUIT TEST. Start/Stop Switch Power Circuit Test Keep the same test setup as for the START/STOP SWITCH OPERATION TEST. Remove cover from fuse box 2. Refer to POWER DISTRIBUTION. If both tests succeeded, the START/STOP switch and its circuit, the control circuit and ECM are functional. If any test failed, perform the following test. smr2009-030-033_a 2009-027-009_a 1. Fuse box 1 2.
Fuse box 2 Slightly raise the end of the long bus bar just enough to probe the fuse box terminal without losing contact between all the terminals and the bus bar. smr2009-034-001_a 1. Slightly raise this end Use the FLUKE 115 MULTIMETER (P/N 529 035 868) and select . Test continuity of the circuit as per following table. If test failed, problem is in the power circuit com- ing from fuse box 2. Perform the START/STOP SWITCH POWER CIRCUIT TEST.
smr2009-030-033_e 316 smr2009-034 START/STOP SWITCH INPUT VOLTAGE TEST SWITCH POSITION 8-PIN CONNECTOR OF DIAGNOSTIC HARNESS VOLTAGE Released Pins 1 and 2 Battery voltage Pressed and held Close to 0 Vdc START/STOP SWITCH INPUT VOLTAGE TEST SWITCH POSITION 8-PIN CONNECTOR OF DIAGNOSTIC HARNESS VOLTAGE Released Pin 2 and battery ground Battery voltage