Section 05 ELECTRICAL SYSTEM Subsection 05 (STARTING SYSTEM) smr2009-034-006_a smr2009-034-002_c 1. Fuse box 2 If test succeeded, carry out a SOLENOID CON- TROL CIRCUIT TEST. If test failed, carry out a POWER CIRCUIT TEST as follows. Solenoid Input Voltage Test (at Solenoid Connector) Disconnect solenoid connector. Solenoid Power Circuit Test Remove relay in fuse box 2. Set multimeter to . Test continuity of wiring as per following table. smr2009-034-007_a 1. Solenoid connector Install D.E.S.S. key. Press the START/STOP button to activate ECM. Use the FLUKE 115 MULTIMETER (P/N 529 035 868) andselect Vdc. Measure voltage as per following table.
smr2009-034-006_b If test failed, repair or replace wiring/connectors. If test succeeded, power circuit is functional. Solenoid Control Circuit Test Use the FLUKE 115 MULTIMETER (P/N 529 035 868) and select . Disconnect the B connector from ECM. Install ECM ADAPTER TOOL (P/N 529 036 166) on ECM connector. Test continuity of wiring as per following table. 318 smr2009-034 SOLENOID POWER CIRCUIT TEST SOLENOID CONNECTOR FUSE BOX 2 TERMINAL RESISTANCE Pin A A10 Close to 0 (continuity) SOLENOID INPUT VOLTAGE TEST (SOLENOID CONNECTOR) TEST PROBES VOLTAGE READING Pin A Battery ground Battery voltage