Bombardier Recreational Products Inc. (BRP) Sea-Doo RXT iS255 GTX LIMITED — Print Preview - C:\DOCUME~1\coderma\LOCALS~1\Temp\.aptcache\smr2009Piranhaen6/tfa03092

Section 06 STEERING AND PROPULSION Subsection 01 (STEERING AND O.T.A.S.) smr2009-042-007_a 1. Steering column 2. Steering column clamp bolts 3. Steering column clamp 4. Steering cable adjusting nut smr2009-037-034_a MONITORING AND IBR TABS 1. O.T.A.S. "LED" After adjustment, torque steering column clamp bolts to 6 N•m (53 lbf• in ). NOTICE Verify when the handlebar is turned completely to the left or right side, that there is no interference with jet pump or reverse parts. Then, engine speed will gradually decrease to idle speed within approximately 5 seconds. Repeat test for the other side. If O.T.A.S. system “LED” does not turn on, check for fault codes.

If the RPM does not behave as described, check the O.T.A.S. switch. INSPECTION O.T.A.S. OPERATION This test is to be performed with the watercraft in the water (test tank or on a trailer). PROCEDURES NOTICE If the test is performed on a trailer, ensure no debris or rocks can damage the jet pump. NOZZLE Nozzle Removal Raise the iBR gate by activating the iBR override function. Refer to IBR AND VTS subsection. Disconnect steering cable from nozzle arm. Connect B.U.D.S.Refer to COMMUNICATION TOOLS AND B.U.D.S. SOFTWARE subsection. Start engine. Raise engine speed higher than 4000 RPM for more than 1 second. Release throttle while steering is in the straight ahead position.

Within 1 to 3 seconds, turn handlebar all the way to one side. The O.T.A.S. should come on by keeping or increasing engine speed to approximately 3000 RPM. Immediately look in B.U.D.S. to see if the O.T.A.S. system turns on. smr2009-037-004_a 1. Steering cable bolt 2. Nozzle arm From the top and underneath nozzle, remove hexagonal screws retaining nozzle link rod to noz- zle arm and socket screws securing the nozzle to the VTS trim ring. 362 smr2009-037