Bombardier Recreational Products Inc. (BRP) Sea-Doo RXT iS255 GTX LIMITED — Print Preview - C:\DOCUME~1\coderma\LOCALS~1\Temp\.aptcache\smr2009Piranhaen6/tfa03092

Section 06 STEERING AND PROPULSION Subsection 02 (iBR AND VTS) IBR GATE LOCKING SLEEVE REPLACEMENT 4. Install new screw(s) with Scotch Grip thread- locker and torque as specified in exploded view. NOTE: The iBR locking sleeve (iBR key) should be replaced if it is cracked, broken, show signs of ad- vance wear, is loose fitting in the "U" arm or on the iBR actuator shaft, or every 100 hours as per the maintenance schedule. INSPECTION IBR SYSTEM FUNCTIONAL TEST Test on Dry Land NOTE: This test requires two people. One person to start watercraft and operate controls, and one person to observe iBR gate movement. 1. Provide adequate ventilation of exhaust gases or move watercraft outside.

NOTICE Do not install an exhaust ventilation hose in the iBR gate area or damage may oc- cur when the iBR gate moves downward dur- ing operation. 2. Connect a water hose to the watercraft to pro- vide exhaust system cooling when operating engine. Refer to EXHAUST SYSTEM subsec- tion for procedure. smr2009-038-020_a 1. Worn locking sleeve 1. Move the iBR gate to the forward position (full up), refer to iBR OVERRIDE in SYSTEM DE- SCRIPTION (iBR) of this subsection. NOTICE Ensure there are no tools or other object that may interfere with the iBR gate movement. Do not run watercraft for more than 2 min- utes out of water or damage may occur to drive shaft seal carrier.

NOTICE Do not try to move the iBR gate by hand if the locking sleeve (iBR key) is installed or component damage will occur. CAUTION Wait at least 5 minutes for wa- tercraft electrical power to shut down before working in the iBR gate area. 2. Remove and discard the hexagonal screw(s) se- curing the iBR gate locking sleeve (iBR key) and remove the sleeve from the iBR "U" arm and ac- tuator. WARNING The person observing the iBR gate move- ment must stand to the side of the stern well clear of the iBR gate and pump nozzle, and in full view of the operator. 3. Start watercraft and allow to run at idle RPM. NOTE:

If iBR gate was not in the neutral position, it will move to the neutral position on engine start up. 4. Depress the throttle lever slightly and visually confirm the iBR gate moves to the forward po- sition (up to the VTS trim position), then release throttle. The iBR gate must remain in the for- ward position. 5. Depress the iBR lever fully and confirm the iBR gate moves to the full down position. 6. Release the iBR lever completely and confirm the iBR gate moves to the neutral position. 7. Shut engine off and disconnect water hose. smr2009-038-002_a 1. Hexagonal screw(s) 2. Locking sleeve 3. Insert a new locking sleeve. smr2009-037 381