Bombardier Recreational Products Inc. (BRP) Sea-Doo RXT iS255 GTX LIMITED — Print Preview - C:\DOCUME~1\coderma\LOCALS~1\Temp\.aptcache\smr2009Piranhaen6/tfa03092

Section 06 STEERING AND PROPULSION Subsection 02 (iBR AND VTS) NOTE: Connect only the test harness 12 and 6 pin connectors to both sides of same steering har- ness connectors. smo2009-002-124_a Step 1: Push storage bin latches backwards (one each side) Step 2: Lift and tilt forward to remove storage bin smr2009-042-005_e 1. 6-pin connector 2. 12-pin connector 5. Remove the D.E.S.S. key and wait approx- imately 3 minutes for the electrical system power to shut off. 6. Reach in under the moving deck (steering area) and disconnect the 6-pin and the 12-pin steer- ing connectors located just behind the forward ventilation box. 8. Press the START/STOP button to wake up the electrical system. 9.

Install the D.E.S.S. key on its post. Step 1: Press START/STOP button Step 2: Install D.E.S.S. key sdd2009-001-019_g NOTE: Electrical power will shut off after approx- imately 3 minutes. Briefly press the START/STOP button to reactivate the electrical system when re- quired. 10. Using a FLUKE 115 MULTIMETER (P/N 529 035 868) set to Vdc, measure the BRLS voltages from the installed diagnostic harness connec- tors as per following tables. smr2009-036-004_c 1. Forward ventilation box 2. 12-pin connector to disconnect 3. 6-pin connector to disconnect 7. Connect the DIAGNOSTIC HARNESS (P/N 529 036 179) in series between the disconnected steer- ing connectors. 529036179 384 smr2009-037