Bombardier Recreational Products Inc. (BRP) Sea-Doo RXT iS255 GTX LIMITED — Print Preview - C:\DOCUME~1\coderma\LOCALS~1\Temp\.aptcache\smr2009Piranhaen6/tfa03092

Section 06 STEERING AND PROPULSION Subsection 02 (iBR AND VTS) Continuity Test of BRLS Wiring Harness 1. Ensure the steering connector (C01-12 POS and C03-6 POS) pins are clean, make good contact, and properly connected. 2. Remove the steering cover, refer to BODY sub- section. 3. Disconnect the BRLS connector. smr2009-030-033_c BRLS VOLTAGE TEST AT 6 PIN CONNECTOR smr2009-038-001_a 1. BRLS 2. BRLS connector 4. Open the boarding platform and remove the LH storage bin. smr2009-030-033_b BRLS VOLTAGE TEST AT 12 PIN CONNECTOR 11. If voltage measured is as specified, the BRLS sensor is functioning properly. NOTE:

When moving iBR lever, BRLS voltage change should increase or decrease in a steady linear fashion. 12. If voltage is out of specification, carry out a continuity test of the wiring between the iBR module and the BRLS sensor, refer to CONTI- NUITY TEST OF BRLS WIRING HARNESS. smo2009-002-127_b Step 1: Open the boarding platform Step 2: Remove the LH storage bin 5. Disconnect the 12 pin connector from the iBR actuator.

smr2009-037 385 6-PIN CONNECTOR OF DIAGNOSTIC HARNESS iBR LEVER RELEASED iBR LEVER PULLED IN PIN VOLTAGE (Vdc) 4 5 4.9 - 5.1 5 6 0.15 - 0.35 1.4 - 1.6 12-PIN CONNECTOR OF DIAGNOSTIC HARNESS iBR LEVER RELEASED iBR LEVER PULLED IN PIN VOLTAGE (Vdc) 5 4 4.9 - 5.1 3 4 0.4 - 0.6 2.9 - 3.1