Section 06 STEERING AND PROPULSION Subsection 02 (iBR AND VTS) 2. Open the boarding platform and remove the LH storage bin. 3. Disconnect the two aft electrical connectors from the iBR actuator. The forward electrical connector (iBR motor power) does not need to be removed. smr2009-038-002_a 1. Hexagonal screw(s) 2. Locking sleeve 6. Remove the five hexagonal screws securing the iBR actuator to the LH support plate. smr2009-038-003_a 1. iBR actuator 3 pin connector 2. iBR actuator 12 pin connector 4. Disconnect the three water pressure hoses in- dicated in the following illustration from the iBR actuator. smr2009-038-005_a 1. Hexagonal screws to remove (1 screw not visible) 7.
Pull the iBR actuator from the support plate. iBR Actuator Installation Installation is the reverse of the removal proce- dure however, pay attention to the following: Clean all actuator mounting screw threads and apply LOCTITE 243 (BLUE) (P/N 293 800 060) on threads (or install new screws with Scotch grip). Install the iBR locking sleeve using a new hexagonal screw with Scotch grip. Torque hexagonal screws securing iBR actuator and iBR locking sleeve as specified in exploded view. Torque gear clamps securing water pressure hoses to 2 N•m (18 lbf• in ). Apply a small amount of DIELECTRIC GREASE (P/N 293 550 004) to the connector pins before installing the connectors on the iBR actuator.
smr2009-038-004_a 1. Pressure hose from jet pump 2. Pressure hose to intercooler 3. Pressure hose to exhaust manifold 5. Remove and discard the hexagonal screw(s) se- curing the iBR gate locking sleeve (iBR key) and remove the sleeve from the iBR "U" arm and ac- tuator. 392 smr2009-037