Section 06 STEERING AND PROPULSION Subsection 02 (iBR AND VTS) iBR GATE iBR Gate Removal (with VTS Trim Ring and Steering Nozzle) 1. Move the iBR gate to the forward position (full up) using the iBR OVERRIDE function. Refer to SYSTEM DESCRIPTION (iBR) in this subsec- tion. NOTICE Do not try to move the iBR gate by hand with the locking sleeve (iBR key) installed or component damage will occur. CAUTION Wait at least 5 minutes for watercraft electrical power to shut off before working in the iBR gate area. 2. Remove the hexagonal screw(s) securing the iBR gate locking sleeve (iBR key) and remove the sleeve from the iBR "U" arm and actuator. smr2009-038-006_a 1. Disconnect here 2.
Linkage arms 5. Move the "U" arm up over the jet pump to ease access. 6. Disconnect the steering cable from the steering nozzle lever. smr2009-038-002_a 1. Hexagonal screw(s) 2. Locking sleeve 3. Using your hand, move the iBR gate to the down position. 4. Disconnect the iBR gate at the linkage arms that connect the gate to the "U" arm by remov- ing hexagonal screws (one each side). smr2009-038-007_a 1. Steering cable hexagonal screw 2. Nozzle lever 7. Remove the VTS trim ring retaining hexagonal screws and washers. smr2009-037 393