Bombardier Recreational Products Inc. (BRP) Sea-Doo RXT iS255 GTX LIMITED — Print Preview - C:\DOCUME~1\coderma\LOCALS~1\Temp\.aptcache\smr2009Piranhaen6/tfa03092

Section 06 STEERING AND PROPULSION Subsection 02 (iBR AND VTS) iBR Gate and VTS Trim Ring Disassembly VTS Trim Ring Removal Remove the two hexagonal screws securing the iBR gate to the VTS trim ring. smr2009-038-008_a 1. Trim ring hexagonal screw (LH side) smr2009-038-011_a 1. iBR gate retaining hexagonal screws to remove Trim Ring Inspection 1. Inspect trim ring and metal spacers for cracks, oblong holes, evidence of wear and deforma- tion. 2. Inspect plastic bushings and friction sleeves for cracks, deformation and signs of wear. smr2009-038-009_a 1. Trim ring hexagonal screw (RH side) 8. Remove the spacer sleeves from the VTS trim ring.

smr2009-038-012_a VTS TRIM RING (WITH NOZZLE AND STEERING ARM) 1. Friction sleeves (2 each side) 2. Plastic bushings (x8) smr2009-038-010_a 1. Trim ring spacer sleeve to remove (LH side illustrated right side similar) NOTE: iBR gate, VTS trim ring and nozzle will come off as a unit when the trim ring spacer sleeves are removed. Secure the assembly with one hand as you remove the spacer sleeves. 394 smr2009-037