Section 06 STEERING AND PROPULSION Subsection 02 (iBR AND VTS) 2. Replace as required. Steering Nozzle Lever Inspection 1. Inspect steering nozzle lever, steering arms, and spacers for cracks, elongated holes, ev- idence of wear, deformation and other dam- ages. 2. Replace as required. iBR Gate Inspection 1. Inspect the iBR gate and its plastic liner for cracks, out of round holes, evidence of wear, deformation and other damages. 2. Inspect plastic bushings (x4) for cracks, wear, and deformation. 3. Replace as required. smr2009-038-012_c 1. Socket head screws to remove (top and bottom) Steering Nozzle Lever Removal 1.
Remove the hexagonal screws securing the steering arms (links) to the steering nozzle lever, top and bottom. smr2009-038-014_a 1. Plastic liner 2. Plastic bushings smr2009-038-012_d 1. Hexagonal screws to remove (top and bottom) iBR Gate and VTS Ring Reassembly Install all parts removed in the reverse order of re- moval, however pay attention to the following: Install new friction sleeves (as required). Install new plastic bushings (as required). Install new hexagonal screws with Scotch Grip threadlocker. Torque all retaining screws as per exploded view.
When installing the iBR gate onto the VTS ring, position the VTS ring so that the small end of the steering nozzle is facing you with the steering lever towards the RH side. Position the iBR gate over the ring so that the warning label is facing you (right side up) and install the mounting hardware as seen in the exploded view. The attachment points for the linkage arms will be facing away from you (not visible in following illustration of iBR gate and VTS ring assembly). 2. Remove the hexagonal screws securing the steering nozzle lever to the VTS trim ring, top and bottom. smr2009-038-012_e 1. Hexagonal screws to remove (top and bottom) Steering Nozzle Inspection 1.
Inspect steering nozzle for cracks, wear, defor- mation, and other damages. 396 smr2009-037