Section 06 STEERING AND PROPULSION Subsection 02 (iBR AND VTS) smr2009-038-011_b 1. Small end of nozzle 2. Steering lever 3. Warning label smr2009-038-015_a 1. "U" arm 2. Hexagonal screw and washer 3. Spacer sleeve 4. Actuator shaft iBR Gate Installation (with VTS Trim Ring and Steering Nozzle) Installation is the reverse of the removal proce- dure however, pay attention to the following: Install new plastic bushings (as required). Install all new hexagonal screws with Scotch Grip threadlocker. Lift the 2 linkage arms on the "U" ring as you insert the iBR gate and VTS ring between the mounting plates. Secure the VTS ring to the mounting plates, then secure the linkage arms to the iBR gate.
Torque all retaining screws as specified in ex- ploded view. "U" Arm Inspection 1. Inspect "U" arm and linkage arms (x2) for cracks, wear, and signs of twisting and bending. 2. Ensure the VTS cams on the "U" arm are not worn, cracked or broken. 3. Inspect the plastic bushings (x5) for cracks, wear and deformation. 4. Replace parts as required. "U" ARM "U" Arm Removal 1. Carry out the iBR GATE REMOVAL (WITH VTS TRIM RING) procedure as detailed in this sub- section. 2. Remove the RH "U" arm retaining hexagonal screw and washer. 3. Secure the "U" arm with one hand and remove the RH spacer sleeve. 4. Remove "U" arm from actuator shaft. smr2009-038-016_a 1. Linkage arms 2.
Plastic bushings (x5) 3. VTS cams "U" Arm Installation Installation is the reverse of the removal proce- dure however, pay attention to the following: Install new plastic bushings (as required). Install all new hexagonal screws with Scotch Grip threadlocker. Torque all retaining screws as per exploded view. smr2009-037 397