Section 07 BODY AND HULL Subsection 02 (BODY) Deck Extension Installation 1. Position the deck extension. 2. Install screws retaining deck extension and air inlet. 3. Tighten these screws to 1.5 N•m (13 lbf• in ). NOTICE Do not tighten screws over this recommended torque. Otherwise, the rubber grommet could turns and screw will be hard to remove. 4. Install coolant reservoir screws and tighten them to 5 N•m (44 lbf• in ). 5. Reposition moving deck. Refer to MOVING DECK in this subsection. smr2009-016-001_a 1. Vent box 2. Retaining latches 3. Remove screws securing air inlet to deck ex- tension. MOVING DECK smr2009-042-008_a 1. Moving deck smr2009-042-020_a 1.
Air inlet retaining screws The moving deck is comprised of: Front storage cover Front body module Steering Seat Foot wells. The moving deck is attached to the intelligent sus- pension and moves as a single unit. The moving deck does not comprise the boarding platform and the rear storage bins. It is possible to tilt the moving deck for servicing the watercraft, such as: Deck extension removal Working on air intake system Suspension position sensor replacement Suspension hydraulic pump replacement. The moving deck removal is also required for ma- jor repairs, such as: Engine removal Suspension component removal (except sus- pension position sensor) Fuel tank removal. 4.
Remove coolant reservoir screws. smr2009-042-021_a 1. Coolant reservoir screws 5. Remove all screws retaining deck extension to fixed deck. 6. Close seat. 7. Tilt the MOVING DECK, see procedure in this subsection. 8. Remove the deck extension. smr2009-042 469