Section 07 BODY AND HULL Subsection 03 (HULL) 9. Reinstall coolant hoses on ride plate fittings, pay attention to gear clamp positioning. See following illustration. 3. Sealant is applied between the jet pump sup- port and the ride plate. Using a heat gun, heat the base of the pump support to soften the sealant and carefully pry the pump support off the ride plate. smr2009-043-016_b 1. Gear clamp positioning smr2009-043-019_b APPLY HEAT HERE 10. Install jet pump, refer to the JET PUMP sub- section. 11. Install iBR gate and VTS trim ring, refer to the IBR AND VTS subsection. 12. Install battery and electrical accessories sup- port, refer to CHARGING SYSTEM subsec- tion. 13.
Refill cooling system and carry out a leak test. Refer to COOLING SYSTEM subsection. 14. Install all remaining parts in the reverse order of removal. Jet Pump Support Cleaning 1. Scrape off all excess sealant from jet pump sup- port, ride plate, and hull. 2. Inspect pump support for cracks and other damages. Replace as necessary. 3. Clean jet pump support and hull surface with BRP HEAVY DUTY CLEANER (P/N 293 110 001) to eliminate grease, dust, and sealant residue. Jet Pump Support Installation 1. Ensure sealant contact areas are clean and dry. 2. Apply LOCTITE 5900 (P/N 293 800 066) on the ride plate and pump support as seen in the following illustrations.
JET PUMP SUPPORT Jet Pump Support Removal 1. Remove the inlet grate and ride plate, see pro- cedures in this subsection. 2. Remove the four screws retaining the pump support to the ride plate. smr2009-043-021_a 1. Apply loctite 5900 here smr2009-043-019_a TYPICAL - TOP VIEW RIDE PLATE AND PUMP SUPPORT 1. Pump support retaining screws smr2009-042 503