Electronic control fuel injection system (Common rail type) 1E-307 Step Action Value YES NO 4 Check for installation condition of the boost pressure sensor connector, ECM connector and coupling connector. 1. Check for play or looseness in the connection. 2. If the trouble is detected, repair as required. Is the trouble detected? — Go to Step 12. Go to Step 5. 5 1. Turn the key switch to “OFF”. 2. Disconnect the boost pressure sensor connector. 3. Short between the boost pressure sensor connector power supply terminal and the signal terminal using jump cable. 4. Turn the key switch to “ON”. 5. Check for “MAP (manifold absolute pressure) sensor” on the data display using scan tool.
Is the “MAP (manifold absolute pressure) sensor” more than the specified value? 4.8V Go to Step 8. Go to Step 9. 6 1. Check for followings in the power supply circuit between ECM and boost pressure sensor using breaker box or DMM. Refer to “Breaker box inspection procedure”. Note: If breaker box is not available, refer to “On- board check procedure for sensors”. • Open circuit • High resistance 2. If the trouble is detected, repair as required. Is the trouble detected? — Go to Step 12. Go to Step 7. 7 1. Check for followings in the signal circuit between ECM and boost pressure sensor using breaker box or DMM. Refer to “Breaker box inspection procedure”. Note:
If breaker box is not available, refer to “On- board check procedure for sensors”. • Short circuit to boost pressure sensor ground circuit • Short circuit to ground • Open circuit • High resistance 2. If the trouble is detected, repair as required. Is the trouble detected? — Go to Step 12. Go to Step 9.