1E-510 Electronic control fuel injection system (Common rail type) Breaker box inspection procedure Perform the inspection in the following procedure if there is such an instruction to use breaker box in the step. After inspection, return to the diagnostic step. Name 1. Breaker box 2. DMM Step Action Value YES NO 21 Check for installation condition of the main relay, ECM connector and coupling connector. 1. Check for play or looseness in the connection. 2. If the trouble is detected, repair as required. Is the trouble detected? — Go to Step 15. Go to Step 22. 22 1. Turn the key switch to “OFF”. 2. Remove the main relay. 3. Turn the key switch to “ON”. 4.
Connect the DMM between the main relay connector terminal (contact point side) and the ground. 24V Go to Step 11. Go to Step 9.