MAINTENANCE PROCEDURE MAINTENANCE CHECK AND TIGHTEN TRACK SHOE BOLTS (Machine equipped with steel shoes, road liners) If the machine is used with track shoe bolts (1) loose, they will break, so tighten any loose bolts immediately. Method for further tightening of road liner Tighten to a tightening torque of 196 ± 19.6 N•m (20 ± 2 kgf•m, 144.7 ± 14.5 lbft) then check that the nut and shoe are in close contact with the link contact surface. Method for further tightening of steel shoe 1. First tighten to a tightening torque of 117 ± 19.6 N•m (12 ± 2 kgf•m, 86.8 ± 14.5 lbft) then check that the nut and shoe are in close contact with the link contact surface. 2.
After checking, tighten a further 90є ± 10є. Order for tightening Tighten the bolts in the order shown in the diagram on the right. After tightening, check that the nut and shoe are in close con- tact with the link mating surface. AD053090 4-26