B F25D.B F30D Resistance check: Resistance can be checked with the carburetor mounted on the motor. Measure the resistance between the 2P connector termi- nals. I I Resistance I 15.8 - 24.2 SZ Operation check: Operation check must be made on the assembled carbu- retor. 1) Install a vinyl tube or equivalent in the hole in the position of the carburetor shown (silencer plate side). 2) At room temperature, gently blow into the tube and verify air passes through the passage (fuel enrich- ment circuit is active). [2] VIN 3) Connect the 12V battery positive (+) terminal to the brown/white terminal and negative (-) to the blacklgreen terminal for about five minutes.
A gentle puff of air should not pass through (fuel enrichment circuit is fully closed). [31 141 BLACWGREEN (-) BROWWHITE (+) \ / Note that inspection with the battery connected must be made quickly. CAUTION The SE thermal valve heater becomes very hot when the battery is connected. Take care not to touch it directly. +1 [l] Blow. 7 [5] BATTERY (FUEL ENRICHMENT CIRCUIT) 5-1 5