EPA07 MBE 4000 SERVICE MANUAL 6. Remove the remaining two flywheel bolts. 7. Inspect the flywheel bolts. Replace the bolts if any of the shanks are stretched beyond the maximum length of 77.0 mm (3.03 in.). See Figure 1-92. 1. Shank Figure 1-92 Measuring the Flywheel Bolts 8. Install pilot bearing remover tool (J-46170) into the bearing and expand the tool to fit snug in the bearing inside diameter.. 9. Attach a suitable slide hammer (J-6471–02), with 5/8–18 male threads, on the extractor and remove the bearing. See Figure 1-93. 1. Flywheel 2. Crankshaft Figure 1-93 Pilot Bearing All information subject to change without notice. DDC-SVC-MAN-0026 Copyright © 2011 DETROIT DIESEL CORPORATION 1-105