Detroit Diesel — Print Preview - C:\DOCUME~1\jcampb01\LOCALS~1\Temp\.aptcache\compdisp049\compdisp

EPA07 MBE 4000 SERVICE MANUAL 12. Install carbon scraper ring in the cylinder liner groove. See Figure 1-114. 13. Check carbon scraper ring for correct fit after installation. 14. Install the cap half of the bearing shell in the bearing cap, as marked on removal. See Figure 1-112. [a] Be sure that the locking lug in the bearing shell is fully seated in the groove of the cap. [b] Lubricate the bearing surface with a light coating of clean engine oil. 15. Measure the connecting rod bolts stretched length. Replace any bolts that exceed the maximum length of 68.5 mm (2.70 in.). Lubricate the stretch bolt threads with a light coating of engine oil. 16.

Install the bearing cap on the connecting rod and hand-tighten the stretch bolts. Be sure that the marks on the cap and the rod match. 17. Tighten the M16 x 1.5 connecting rod stretch bolts alternately. Tighten each one in turn to the first stage and then go on to the next stage. Listed in Table . Table 1-32 Connecting Rod Stretch Bolts Tightening Stages 18. Check the connecting rod end play (axial play). Refer to section 1.19.1.2. 19. Rotate the crankshaft to make sure it turns freely. NOTE: If it is necessary to turn the crankshaft and the flywheel has been removed, install the flywheel guide pins in the crankshaft gear. All information subject to change without notice.

DDC-SVC-MAN-0026 Copyright © 2011 DETROIT DIESEL CORPORATION 1-129 Max. Shaft Length mm (in.) Tightening Stage Torque N·m (lb·ft) 68.5 (2.70) Stage 1 108 (80) Stage 2 Additional 90 degree rotation