Komatsu — AFTER STARTING ENGINE

OPERATION MACHINE OPERATIONS AND CONTROLS 3. Operate bucket control lever (3) and arm control lever (4) slowly to move the bucket cylinder and arm cylinder to the ends of their stroke. Arm operation Bucket operation OUT DUMP 4. Carry out bucket and arm operation for 5 minutes at full stroke, alternating between bucket operation and arm operation at 30 second intervals. IN CURL REMARK If swing lock switch (5) is set to the ON position, you can raise the oil temperature faster. NOTICE When the work equipment is retracted, take care that it does not interfere with the machine body or ground. ON Left speed Right swing 5.

After carrying out the warming-up operation, check that all the gauges on machine monitor (6) and the caution lamps are in the following conditions. Radiator water level monitor (7): OFF Engine oil level monitor (8): OFF Charge monitor (9): OFF Fuel level monitor (10): Green display Engine water temperature monitor (11): Green dis- play Engine oil pressure monitor (12): OFF Engine water temperature gauge (13): Indicator in black range Fuel gauge (14): Indicator in black range Preheating monitor (15): OFF Air cleaner clogging monitor (16): OFF Hydraulic oil temperature gauge (17): Indicator in black range Hydraulic oil temperature monitor (18): Green dis- play 6.

Check that there is no abnormal exhaust gas color, noise, or vibration. If any abnormality is found, repair it. 7. If air cleaner clogging monitor (16) is lit up, clean or replace the element immediately. For details of the method of cleaning the element, see "CHECK, CLEAN AND REPLACE AIR CLEANER ELE- MENT (PAGE 227)". 8. Use working mode switch (19) on machine monitor (6) to select the working mode to be used. 145