MAINTENANCE PROCEDURE MAINTENANCE EVERY 500 HOURS MAINTENANCE Maintenance for every 250 hours service should be carried out at the same time. LUBRICATING NOTICE For the first 50 hours on a new machine, carry out greasing for greasing points 1 to 12 every ten hours. Carry out the greasing for these points also at 250 hours and 500 hours on a new machine. After this, carry out the greasing every 500 hours or every six months, whichever comes sooner. After carrying out digging work in water, always grease the pins that were under water. When carrying out heavy-duty operations, such as hydraulic breaker operations, carry out the greas- ing every 100 hours. 1.
Set the work equipment in the greasing position below, then lower the work equipment to the ground and stop the engine. 2. Using a grease pump, pump in grease through the grease fittings shown by arrows. 3. After greasing, wipe off any old grease that was pushed out. (1) Boom cylinder rod end pin (2 points) (2) Arm cylinder foot pin (1 point) (3) Boom-Arm coupling pin (1point) (4) Arm cylinder rod end (1 point) (5) Bucket cylinder foot pin (1 point) 258