Isuzu — Isuzu N Series Training Manual

Adjustment 1. Clamp the injection nozzle holder (1) in a vise (2). 2. Use a wrench to remove the injection nozzle retain- ing nut (3). N6A0030E 3. Remove the injection nozzle holder from the vise. 4. Remove the injection nozzle (4), the spacer (5), the spring seat (6) the spring (7) and the adjusting shim (8). N6A0028E 2. Check the spray condition. Refer to the illustration. Spray Condition N6A0031E 5. Install the new adjusting shim, the spring, the spring seat, the spacer, the injection nozzle, and the retaining nut. 6. Clamp the injection nozzle holder in the vise. 7. Tighten the injection nozzle holder retaining nut to the specified torque.

N6A0029E 1) Correct 2) Incorrect (Restrictions in orifice) 3) Incorrect (Dripping) If the spray condition is bad, the injection nozzle must be replaced or adjusted. Refer to “6C FUEL SYSTEM”. Tighten: Injection nozzle holder retaining nut to 34 N m (3.5 kg m/ 25 lb ft) 8. Remove the injection nozzle holder from the vise. Injection Nozzle Opening Pressure Mpa (kg/cm2/psi) 4HF1/4HF1-2/4HG1 18.14 (185/2,631) 4HE1-TC 21.57 (220/3,128) 4HG1-T 1st: 18.1 (185/2,631) 2nd: 21.1 (215/3,057)