JCB — 72.pdf (p.72)

Section E - Hydraulics Circuit Descriptions Bucket Opening Bucket Opening For schematic, K Fig 15. ( T E-45) . Servo pressure from port 1 of the hand controller 48 selects the bucket open spool position via the pilot shuttle block 46 , port A8 and B8. Servo pressure at port Pa7 then selects the bucket spool and upper pressure switch. Flow from pump 2 is available to the bucket spool via the parallel working gallery and boom over bucket priority valve BBV . At the spool the flow is diverted to port A7 of the main control valve 14 to the bucket ram 13 . Returning oil enters the main control valve 14 at port B7 and is diverted by the bucket spool to the tank port.

Pressure in the neutral circuit drops after the selected bucket spool, this is sensed at the port Ps2 and at the pump bringing it into full flow. E-44 E-44 9803/9880-3