Section E - Hydraulics Circuit Descriptions Priority Valves Priority Valves For schematic, K Fig 17. ( T E-49) . Boom over Slew Priority (A) This is selected by the operator via switch in the right hand console. When operated the boom priority solenoid on the 8 spool block 60 is energised sending a signal via port C6 to the main control valve 14 at port Pi1. This selects the boom over slew priority. Oil now being fed to the slew spool is restricted to give priority to the boom. Slew over Dipper Priority (B) This is a non-selectable function automatically carried out within the main control valve 14 when slew is used.
When Slew is selected a signal is sent from the servo Shuttle valve 46 via port C8 to the main control valve 14 at port Pc3. This selects slew over dipper priority valve B and limits the flow to the dipper from pump P2 only. This makes it possible to have maximum slew torque with high slew pressure when the dipper is used at the same time. Boom Priority over Bucket (C) This a non-selectable function automatically carried out within the Main control valve 14 when Boom up is selected. When boom up is selected a signal is sent from port C1 on the servo shuttle valve 46 to the main control valve port Pi2. This selects the boom over bucket priority valve C .
Oil now flowing to the bucket spool is restricted and gives priority to boom up. E-48 E-48 9803/9880-3