daewoo DE12T / P126TI — Daewoo DE12T / P126TI User Manual

Adjust valve clearance with a feeler gauge and tighten the fixing nuts to Valve clearance adjust specified torque. EA8M3007 3.3.22. Rocker arm assembly Apply lubricating oil to the rocker arm bush and shaft, and assemble the inter- mediate bracket with the rocker arm using fixing bolts. Semi-install valve clearance adjusting EAMD100I bolts onto the rocker arm. Install the spring, rocker arm, bracket, rocker arm, spring, washer, and snap ring in the described sequence. Install the rocker arm and bracket in the same direction. EA8M3008 3.3.23. Injection nozzle Install the dust seal with its round portion facing downward.

Mount a seal ring (0.5 mm) on the seal ring seating surface of the nozzle tube and assemble nozzle holder assembly with the stud bolt with the nozzle pipe installing direction facing outward. Be sure to follow the specified torque. EAMD105I - 72 - Torque 4.4 kg•m Torque 4.4 kg•m Torque 1.0 kg•m