. MAINTENANCE MAINTENANCE PROCEDURE 4 - 55 CHECK SWING PINION GREASE LEVEL, ADD GREASE Prepare a s 1. Before sta rting the ins pection , swing 2 tim es to the right o r left, then l ower the work equ ipment to the ground and stop the e Open the remove 3 can locati Remove b on point. olts (3) (4 b remove c 4. Insert a s cale into the grease and check of the grease is approx. 36 mm (1.4 in). Add gr ease if necessa Insert the scale (A) in the position shown in the diagram o n the right when measuring I f th e grease i s particularl y milky due to ingre ss of water, etc. , then remove bolts (5) and cov er (6) from the bott om of the track f rame and remove th e grease.
R eplace all of the gre ase with new gr ease. The total amo unt of greas e is 55 l iters (49.5 k g) (14.5 US gal) (109 lb)). 5. Install cov er (4) with b olts (3) 6. Install pla te (2) with b olts (1).