Case IH AFX8010 — TRANSMISSION Hydrostatic

POWER TRAIN - TRANSMISSION Hydrostatic 13. Install pressure gauges ranges 0 - 600 bar ( 0 - 9000 psi ) to the hydrostatic pump test ports M1 (1) and m2 (2) . 10033621A5 9 14. Remove fuse F01 (1) from the fuse panel. 50020070A5 10 15. Turn the key to the start position, to crank the engine 15 seconds or until 2 - 7 bar ( 30 - 100 psi ) is seen on the gauge. If pressure does not reach these levels, check and fill the PTO oil level. IMPORTANT: Only crank the engine for a maximum of 30 seconds at a time. Wait at least 1 minute before recranking to avoid damaging the starter motor. 16.

Shift the transmission in neutral and crank the engine with the starter motor until a pressure gauge reading of 2.0 bar (29 psi) is obtained. 17. Fill the PTO gearbox to maximum level. 18. Install fuse F01 (1) into the fuse panel. M583 - Make sure everyone is clear of the machine before starting the engine. CAUTION CAUTION M142A - Never operate the engine in a closed building. Proper ventilation is required under all circumstances. 50020070A5 11 9681 1 27/05/2004 C.20.F / 16