POWER TRAIN - TRANSMISSION Hydrostatic 2. In neutral the pressure should be equal indicating approximately 10 bar (145 psi) . As the forward or reverse is activated a pressure rise on one gauge should be countered with corresponding pressure drop on the other gauge. 3. This test may determine the reason for a unit that creeps while the lever is in neutral. Joining the ports together should stop creeping; if this is the case, adjust the neutral position within the control unit. If the unit still creeps when the ports are joined, the pump will require replacement. NOTE: Refer to Pump - General specification (C.20.F.20 - D.40.A.10) "Servo Pressure" for more information.
9681 1 27/05/2004 C.20.F / 20