Case IH AFX8010 — ELECTRICAL POWER SYSTEM

DISTRIBUTION SYSTEMS - ELECTRICAL POWER SYSTEM Continuity (Buzzer) test: Set the range dial to the “Buzz” position. Connect the Red test probe to the Ω terminal. Connect the Black test probe to the “COM” terminal. Connect the test probes to the measuring point. In general, if the resistance is less than 50 Ω then the buzzer will sound, indicating continuity. 16 Note: Buzzers on different multi meters will sound at different ohmic values, depending on the quality of the meter. This can often be misleading. For example, when checking a corroded earth point, a poor quality multi meter may buzz at 150 Ω , indicating continuity and no problem.

When using a higher quality multi meter for the same test, it would not buzz due to the high resistance. When carrying out such tests, we should always check the value of resistance as well as listening out for the buzz. A good connection gives low resistance. A bad connection gives high resistance. 17 SUMMARY : When measuring - Voltage (V) : Connect across the component with the circuit closed. Current (A) : Connect in series with the circuit. Circuit closed. Resistance ( Ω ): Connect across the component with the circuit open. Continuity (Buzz) : Connect the meter across the component with the circuit open. (Always check the value of resistance as well!!) A.30 / 5K