Case IH AFX8010 — ELECTRICAL POWER SYSTEM

DISTRIBUTION SYSTEMS - ELECTRICAL POWER SYSTEM ELECTRICAL TEST PROCEDURES Four electrical tests will be required to properly troubleshoot electrical concerns on the combine. Each test is described in detail. Ensure that all steps are reviewed and followed when testing. 1. Continuity Test, Short to ground 2. Voltage measurement, short to 12 volts 3. Resistance test for components 4. Continuity test, Open circuits ELECTRICAL TEST PROCEDURE 1: CONTINUITY TEST - SHORT TO GROUND CONDITIONS FOR PERFORMING TESTS: 1. Power OFF, Keyswitch OFF, (sometimes battery disconnected or fuse pulled out if specified in procedure). 2.

Connectors at each end or ends of circuit disconnected to prevent false readings. 3. Set meter to measure resistance or ohms, and measure circuit resistance. Use black lead to make contact with a plated metal part on the chassis such as a jump start post if fitted. Make sure the surface of the part is not corroded. Use the red meter lead to touch the connector pins, one pin at a time, and avoid contact with the case of metal connectors. 4. Determine if measured resistance falls within guidelines specified in the procedure. 3 to 4 ohms indicates a direct short to chassis ground and must be located and repaired.

Higher resistances usually indicate circuit paths through modules, and that an additional connector needs to be disconnected to perform the test. More than 100K ohms indicates that the circuit is free of shorts to ground. 18 A.30 / 5L