Case IH AFX8010 — ELECTRICAL POWER SYSTEM

DISTRIBUTION SYSTEMS - ELECTRICAL POWER SYSTEM ELECTRICAL TEST PROCEDURE 2: VOLTAGE MEASUREMENT OR SHORT TO POSITIVE SUPPLY VOLTS CONDITIONS FOR PERFORMING SHORT TO POSITIVE SUPPLY TESTS: 1. Keyswitch ON (sometimes OFF, if specified in procedure). 2. Connectors at sensor, switch or potentiometer end disconnected. All other connectors must be reconnected to perform test. 3. Set meter to measure DC VOLTS, and measure circuit voltage as illustrated. Use the red meter lead to touch the connector pins, one pin at a time, and avoid contact with the case of metal connectors. Use the black lead to make contact with a plated metal part on the chassis such as a jump start post if fitted.

Make sure the surface of the part is not corroded. 4. Determine if measured voltage falls within guidelines specified in the procedure. 19 ELECTRICAL TEST PROCEDURE 3: RESISTANCE TEST FOR ELECTRICAL PARTS CONDITIONS FOR PERFORMING RESISTANCE TEST 1. Disconnect part by unplugging electrical connectors to expose the part assembly connector for testing. 2. Set electrical meter to measure resistance or Ohms and insert test probes into connector terminals specified in procedure. When checking potentiometers, measure from wiper terminal to each of the other terminals while TURNING THE POT SHAFT. This will ensure no open spots escape detection.

When checking rocker or rotary switches, actuate the switch while measuring for opens and shorts. 3. Compare measured values to values specified in the fault code procedures. Allow plus or minus 5 percent of range tolerance for all measurements. 20 A.30 / 5M