CROP PROCESSING - FEEDING Feeder housing 8. Align all phases of joints 0 degrees as shown. These four points (1) should all line up when assembled. There are alignment arrows on the shafts which can be assembled correctly with the arrows aligned. 40033732A4 6 9. Grease and slide the main feeder pivot shaft (1) completely on. 40030042A4 7 10. Install the yoke (1) onto the shaft. Install the two bolts (2) through the yoke from opposite sides. Torque to 101 - 113 Nm . ( 74 - 83 lb ft ). Install the universal joint. 10030041B4 8 9712 1 27/05/2004 K.25.E / 12