CROP PROCESSING - STORING AND HANDLING Grain storing 8. Remove four M10 cap screws, lock washers and nuts (1) and threeM8 cap screws, lock washers and nuts (2) . 10041748A5 8 9. Unlatch and lower auger tube and remove three M8 cap screws, lock washers and nuts (1) . 10041749A5 9 10. Auger tube assembly with gearboxes and mounting plate can now be lifted out of grain tank. Suggested slinging is illustrated. 10041750 10 9716 1 27/05/2004 K.60.B / 12