CROP PROCESSING - STORING AND HANDLING Grain storing Bubble-up auger - Install (K.60.B.50 - F.10.A.15) AFX8010 1. To install the bubble-up auger assembly, follow this procedure: Install foam seal over end of gearbox input shaft. Align so that the input shaft will pass through the holes in grain tank. Install four M8x20 cap screws with lock washers and nuts (1) through upper lip of mounting plate (2) and right side of grain tank. Do not tighten until all fasteners are in place in mounting plate. 10041749B5 1 2. Raise auger tube up to its upper position and latch. Install one M10x25 cap screw with lock washers and nut (1) through rear tip of mounting plate (2) . 10041747B5 2 3.
Install three M8x25 cap screws, lock washers and nuts (1) through the mounting plate and the grain tank wall. Install four M10x25 cap screws, lock washers and nuts (2) through the auger cover support (3) the mounting plate and the grain tank wall. 10041748B5 3 9716 1 27/05/2004 K.60.B / 13