CROP PROCESSING - STORING AND HANDLING Grain storing 8. Pull upwards on center of rope (1) to raise both ends of chain up above the bolted flange joint of the lower body and the main elevator housing. NOTE: If the main elevator housing or the upper shaft is to be removed as well, perform step 6 and then turn the chain out of the bottom while holding the rope to control chain speed. 40037320A5 7 9. Remove nuts to remove cover (1) . 10. Remove lock collar (1) . Loosen nuts (2) and remove the outer bearing flange, the bearing, and the inner flange. 40033213A5 8 50037327A5 9 11.
Remove two cap screws, lock washers and nuts (1) from right hand drives screen and the bracket on front of the elevator. 40033204A5 10 9716 1 27/05/2004 K.60.B / 36