MULTI CYLINDER ENGINES 113 OIL PICKUP (2GM, 2GM20, 3GM AND 3GM30 MODELS) 4. Reinstall the push rods by reversing the removal pro- cedure. Adjust valve clearance as described in Chapter Three. PISTON/CONNECTING ROD ASSEMBLY Piston/Connecting Rod Removal 1. Remove the engine as described in this chapter. 2. Place a suitable container under the oil pan and remove the drain plug. Let the crankcase oil drain, then reinstall the drain plug. 3. Remove the cylinder head as described in this chapter. 4. Remove the oil pan. 5. On 2GM, 2GM20, 3GM and 3GM30 models-Loosen the oil pickup jam nut (Figure 26) and remove the oil pickup. 6. Rotate the crankshaft until the piston is at bottom dead center.
Pack the cylinder bore with clean shop rags. Re- move the carbon ridge at the top ofthe cylinder bore with a ridge reamer. These can be rented for use. Vacuum out the shavings, then remove the shop rags. 7. Rotate the crankshaft until the connecting rod is cen- tered in the bore. Measure the clearance between the con- necting rod and the crankshaft journal flange with a flat feeler gauge (Figure 27). If the clearance exceeds specifi- cations (Tables 1-3), replace the connecting rod during re- assembly. 8. Remove the connecting rod bolts. Lift off the cap, to- gether with the lower bearing insert. 9. Use a wooden hammer handle to push the piston and connecting rod from the bore. 10.
Remove the piston rings with a ring remover (Figure 28). When installing the valve guides, the grooved end must be toward the top of the cylinder head. The groove must be flush with the head surface as shown in Figure 25. PUSH RODS 1. Remove the rocker arms as previously described. 2. Remove the push rods and mark them so they can be reinstalled in their original positions. 3. Inspect the push rod ends for damage. Maximum al- lowable runout is 0.03 mm (0.0012 in.).