Yanmar — Yanmar Diesel Inboard Shop Manual for One, Two, and Three Cylinder Engines

SINGLE-CYLINDER ENGINES 93 - Dial gauge 5 , 3. Che ck all journals aga inst specifications (Table 1) for out-of-roundness and taper. Have the crankshaft reground, ifnecessary, and install new undersize bearings. / M AI N BE ARING S The crankshaft is supported at each end by bush- ing-type main bearings. The front main beari ng is located in the crankcase and the rear main bearing is located in the removab le main bearing carrier. Thrust bearings located at the front of the crankshaft control cran kshaft end play. Refer to Figure 70. Remove the crankshaft as described in the previous sec- tion for access to the main bearings and thrust washers.

Unless prec ision measuring equipment is available, have a dealership or machine shop measure main bearing di- mensions. Refe r to specifications in Table I. If bearing replacement is necessary, have the main bear- ings rep laced by a dealership or machine shop. Make sure the oil holes (B, Fi gur e 76) in the main bea rings align with the oil passages in the crankcase and main bearing earner. If gear back lash is incorrect, rep lace the camshaft and crankshaft gears. Inspection CA MS HAF T 1. Clean the crankshaft thoroughly with solvent. Blow out the oil passages with compressed air. 2. Check the main and connecting rod journa ls for wea r, scratches, grooves, scoring or cracks.

Check the oil seal contact surface for burrs, nicks or other sharp edges that might damage a seal during installation. Removal and Installation I. Remove the fuel transfer pump (F igure 80). 2. Remove {he crankshaft as previously described. 3. Prevent rotation of the camshaft gear by holding a screwdriver or other tool against the cams haft bearing re- taining screw (F igu re 81). 4. Remove the camshaft gear nut (A, Flgure 82), fuel in- jection pump cam (B) and camshaft gear (C). 5. Position the engine so the valve lifters will not fall out when the camshaft is withdrawn/removed. NOTE Unless precision measuring equipment is available, have a machine shop perform Step 3.