05-E2B, 05-E2BG, WSM DIESEL ENGINE Nozzle Heat Seal Service Removal Procedure IMPORTANT Q Use a plus (phillips head) screw driver (1) that has a diameter which is bigger than the heat seal hole (Approx. 6 mm (1/4 in.)). 1. Drive screw driver (1) lightly into the heat seal hole. 2. Turn screw driver three or four times each way. 3. While turning the screw driver, slowly pull the heat seal (4) out together with the injection nozzle gasket (3). 4. If the heat seal drops, repeat the above procedure. (When reassembling) Heat seal and injection nozzle gasket must be changed when the injection nozzle is removed for cleaning or for service.
(1) Plus Screw Driver (2) Nozzle Holder (3) Injection Nozzle Gasket (4) Heat Seal W1021255 Rocker Arm and Push Rod 1. Remove the rocker arm bracket screws. 2. Detach the rocker arm assembly (1). 3. Remove the push rods (2). (When reassembling) When putting the push rods (2) onto the tappets (3), check to see if their ends are properly engaged with the dimples. IMPORTANT Q After installing the rocker arm, be sure to adjust the valve clearance. (1) Rocker Arm Assembly (2) Push Rod (3) Tappet W1021437 S-29 KiSC issued 06, 2011 A Tightening torque Rocker arm bracket screw 21.6 to 26.5 N·m 2.2 to 2.7 kgf·m 15.9 to 19.5 ft-lbs