ATTACHMENTS (CONT’D) Figure OI-76 Using The X-Change System (Cont’d) Installing Bucket Or Attachment (Bolt On X-Change) (Cont’d) Figure OI-74 1 2 2 1 P-49716 Install the pin (Item 1) in the X-Change. Orientate the bolt holes (Item 2) [Figure OI-74] as shown. Figure OI-75 P-49835 1 Start the engine and move the arm towards the bucket. Raise the boom until the pins (Item 1) engage the hooks (Item 2) [Figure OI-76] on the bucket. P-49717 Install the bolt (Item 1) [Figure OI-75] and washer through the X-Change and into the pin. 325/328 Excavator 33 Operation and Maintenance Manual