ATTACHMENTS (CONT’D) Stop the engine. Turn the start key to the ON position and move both hydraulic control levers to relieve hydraulic pressure. Using The X-Change System (Cont’d) Installing Bucket Or Attachment (Bolt On X-Change) (Cont’d) WARNING Figure OI-77 Keep all onlookers 6 m away from equipment when operating. Contact with moving parts, a trench collapse or flying objects can cause injury or death. W-2119-0788 Figure OI-78 1 1 P-49718 2 3 Install the plate (Item 1) [Figure OI-78] . P-49837 Raise the boom, and extend the bucket cylinder until the bucket is in the position shown [Figure OI-77] .
With the arm vertical, lower the boom until the hooks (Item 1) of the bucket disengage the pins (Item 2) of the X-Change and plate (Item 3) [Figure OI-77] engages in the bucket crossmember. 325/328 Excavator Operation and Maintenance Manual 34