OPERATING PROCEDURE (CONT’D) Figure OI-100 Excavating Lower the blade to provide stability. Figure OI-98 MS-1854 Raise the boom, retract the arm and curl the bucket [Figure OI-100] . Rotate the upperstructure. Extend the arm, lower the boom, and open the bucket [Figure OI-98] . NOTE: Do not allow the bucket teeth to make contact with the ground when slewing the upperstructure. Figure OI-99 WARNING Keep all onlookers 6 m away from equipment when operating. Contact with moving parts, a trench collapse or flying objects can cause injury or death. W-2119-0788 Retract the arm, while lowering boom and curling the bucket [Figure OI-99] .
325/328 Excavator Operation and Maintenance Manual 44 MS1855 MS1856