Electrical System R2.8 CM2220 R101B Page 1-46 Section 1 - Installation by Subsystem Figure 12 - Grid Heater Harness and Relay 1 To battery positive post 2 Fusible link 3 Grid heater relay 4 To engine grid heater post 5 To the ECM via the harness leads. Tighten the grid heater relay posts nuts to the following values. Torque Value: Large Post Nut 5.6 N•m [ 50 in-lb ] Torque Value: Small Post Nut 1.7 N•m [ 15 in-lb ] Figure 13 - Grid Heater Engine Post Location To buy Cummins Parts and Service Manuals, Training Guides, or Tools go to our website at https://store.cummins.com