OPERATION 5. Pass wire ropes between the 1st and 2nd track rollers from the front and between the 1st and 2nd track rollers from the rear. However, for machines equipped with a full roller guard for the track roller, pass the wire rope under the track. 6. Set the lifting angle (A) of the wire rope to 30° to 40°, then lift the machine slowly. 7. After the machine comes off the ground, check the hook condition and the lifting posture, and then lift slowly. 2-190 PC200LC-8