OPERATION Lightweight Towing Hole Always use shackles. Set so that the wire rope is horizontal and facing directly to the front from the track frame. Move the machine slowly. Do not apply a sudden load to the wire rope. There is a hole in the track frame to fit the shackle when towing light objects. Permissible towing load: . . . . .PC200 Max. 58,800 N (6,000 kgf) Severe Job Condition When carrying out digging operations in water, if the work equipment mounting pin goes into the water, carry out greasing every time the operation is carried out. For heavy-duty operations and deep digging, carry out greasing of the work equipment mounting pins every time before operation.
After greasing, operate the boom, arm and bucket several times, then grease again. 2-198 PC200LC-8