MAINTENANCE (2) Boom foot pin (two places) (3) Boom cylinder rod end pin (two places) (4) Arm cylinder foot pin (one place) (5) Boom - Arm coupling pin (one place) (6) Arm cylinder rod end (one place) (7) Bucket cylinder foot pin (one place) Lubricate Swing Circle 1. Lower the work equipment to the ground. 2. Using a grease pump, pump in grease through the grease fittings shown by arrows. (two places) 3. After greasing, wipe off any old grease that was pushed out. PC200LC-8 3-59