OPTIONS, ATTACHMENTS Hydraulic Circuit Connection When connecting the attachment, connect the hydraulic circuit as follows. 1. Check that stop valve (1) is at LOCK position (b) (a) FREE: Hydraulic oil flows (direction of arrow is parallel to long direction of arm) (b) LOCK: Hydraulic oil does not flow (direction of arrow is at right angles to long direction of arm) When setting the FREE or LOCK position of the stop valve rotor, remove bolt (2), turn over plate (1), then turn the rotor. After setting, install plate (1) again with bolt (2). 2. Remove plug (3) at the tip of the stop valve piping. (left and right, 2 places) Be careful not to lose or damage the removed parts. 3.
After removing plug (3), connect the attachment piping (4) if provided by the attachment manufacturer. For the mouthpiece size and accumulator add-on, the action to take differs according to the attachment manufacturer, so please consult your Komatsu distributor. PC200LC-8 5-9