MAN — MAN DD13 DD15 Engine Application Installation Manual

DD PLATFORM APPLICATION AND INSTALLATION MANUAL Check for oil leaks Check for exhaust leaks Verify with a digital meter that the charging voltage at the battery cables is at least 13.6 Vdc. 18.5 EXAMPLE INSTALLATION PHOTOS Figure 18-8 Coolant Supply Ports Coolant supply ports located on coolant collector, upper right side of engine, near back of rocker cover. Coolant supply for APU has not yet been installed on third, rear-most ISO port. Cab heater and bunk heater supply lines are installed on the two forward ISO supply ports of the coolant collector. All information subject to change without notice. 18-13 DDC-SVC-MAN-0073 Copyright © 2009 DETROIT DIESEL CORPORATION