Toyota — Service Manual Change History

19-62 19-62 Electrical System Troubleshooting Inspection 1: Carry out distributor individual inspection. Ignition key switch OFF, disconnect G19 and G21, connect G27 1 2 (1) Pickup coil (2 in series) resistance measurement G19 Standard: (Distributor side) (2) Inspection of the air gap between the pickup coils and the timing rotor Standard: 0.2 ~ 0.4 mm (0.008 ~ 0.016 in) Inspection 2: Inspect the timing rotor operation. Disconnect G19 and G21, connect G27, ignition key switch ON Standard: Timing rotor rotates during cranking Inspection 3: Inspect for continuity and short circuiting of the harness. Ignition key switch OFF, disconnect G19, G21 and G27 Standard:

Section 19 G19-1 ~ G19-2 460 ± 50 Ω G27-31 ~ G19-1 Continuity G27-30 ~ G19-2 Continuity G27-31 ~ G27-30 No continuity