Komatsu — LOADING PILED SOIL OR BLASTED ROCK

OPTIONAL ATTACHMENTS 3. When The Material Is Stockpiled: Keep the cutting edge of the bucket at a horizontal angle, using the inching brake pedal in combination with the accelerator pedal, increase the RPM while slowly releasing the left brake pedal as you proceed into the pile slowly with the bucket bottom edge flat on the ground. 4. When Loading Blasted Rock: Angle the cutting edge of the bucket forward slightly. Using the inching brake pedal in combination with the accelerator pedal, increase the RPM while slowly releasing the left brake pedal as you proceed into the pile slowly with the bucket tipped forward. 5.

Once the bucket is into the pile raise the bucket slightly to put weight on the front tires and roll the bucket back, while continuing to enter the pile. Remark Rasing the bucket slightly while into the pile will help reduce wheel spin by putting more weight on the front axle. 6. When full, roll the bucket back to its furthest point and raise the loaded bucket enough to clear the pile as you back out of the pile. 5-4 WA320PT-5L