SECTION 4 OPERATING Page 34 4.18. OPERATING TECHNIQUES Fig. 4.34. Cutting Down a Pile or Hill 1 – Method 1 12 – Method 2 A side-hill cut can be started more easily if a small bench cut is first made as shown in Fig. 4.35. Then, when digging as in Fig. 4.36, keep the inside (uphill) surface slightly lower to gain greater tractor stability. Tilting the blade will provide this type of cut with less effort on the operator's part. Fig. 4.35. Side-Hill Cut 1. Cut I 2. Cut II 3. Cut III Fig. 4.36. Side Hill Cut 1. Level 2. Lower Surface TD-20H DRESSTA